Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

Dupe

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Archives » General Discussion (1/22-2007 thru 12/14/2010) Donate to DU
 
Hissyspit Donating Member (1000+ posts) Send PM | Profile | Ignore Sat Apr-28-07 09:36 PM
Original message
Dupe
Edited on Sat Apr-28-07 09:53 PM by Hissyspit
http://www.nytimes.com/2007/04/29/world/middleeast/29reconstruct.html?hp

Rebuilt Iraq Projects Found Crumbling

By JAMES GLANZ
Published: April 29, 2007
In a troubling sign for the American-financed rebuilding program in Iraq, inspectors for a federal oversight agency have found that in a sampling of eight projects that the United States had declared successes, seven were no longer operating as designed because of plumbing and electrical failures, lack of proper maintenance, apparent looting and expensive equipment that lay idle.

The United States has previously admitted, sometimes under pressure from federal inspectors, that some of its reconstruction projects have been abandoned, delayed or poorly constructed. But this is the first time inspectors have found that projects officially declared a success — in some cases, as little as six months before the latest inspections — were no longer working properly.

The inspections ranged geographically from northern to southern Iraq and covered projects as varied as a maternity hospital, barracks for an Iraqi special forces unit and a power station for Baghdad International Airport.

- snip -

At the maternity hospital, a rehabilitation project in the northern city of Erbil, an expensive incinerator for medical waste was padlocked — Iraqis at the hospital could not find the key when inspectors asked to see the equipment — and partly as a result, medical waste including syringes, used bandages and empty drug vials were clogging the sewage system and probably contaminating the water system.

The newly built water purification system was not functioning either.

MORE

Printer Friendly | Permalink |  | Top
Bitwit1234 Donating Member (1000+ posts) Send PM | Profile | Ignore Sat Apr-28-07 09:40 PM
Response to Original message
1. If you'll remember
before cheney gave Halliburton all those no-bid contracts they couldn't get one anywhere. No one would hire them because of the slip-shod work they were doing. In fact the places where they had 'built' stuff were suing them. So what do we expect they would do, not change overnight.
Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Thu May 02nd 2024, 02:29 AM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Archives » General Discussion (1/22-2007 thru 12/14/2010) Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC