Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

Billions Upon Billions for Berlin-Munich Bullet Train

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
Home » Discuss » Editorials & Other Articles Donate to DU
 
xchrom Donating Member (1000+ posts) Send PM | Profile | Ignore Fri Oct-28-11 09:35 AM
Original message
Billions Upon Billions for Berlin-Munich Bullet Train
http://www.spiegel.de/international/germany/0,1518,794125,00.html


The new rail route being built between Berlin and Munich is nothing if not ambitious -- as well as being the most expensive transportation project to take shape since reunification. But the line is yet another example of how France beats Germany in the high-speed rail game and critics say its costs may not justify the advantages it will bring.



Silberberg (Silver Mountain) is a flashy name for a natural formation standing in the way. Getting rid of the mass of rock is out of the question. In fact, it's hard enough just digging a tunnel through it.

Miners are currently boring their way through the Silberberg, in the mountainous Thuringian Forest region of central Germany, using explosives and hydraulic excavators and a technique called the "New Austrian Tunneling Method." The air is full of the sharp odor of an ammonia compound contained in the explosives.

A wheel loader quickly gathers up the rubble. The driver is wearing a white mask over his mouth.

Once completed, the Silberberg tunnel will stretch more than 7 kilometers (4.4 miles), making it one of the longest tunnels on the new railway line between Erfurt, in eastern German state of Thuringia, and Ebensfeld, in the Bavarian region of Upper Franconia. When the route is finished, it will be capable of accommodating ICE trains traveling at 300 kilometers per hour (186 mph). Each day, the construction project advances an average of 6.5 meters (21.3 feet).

Of the total distance of 107 kilometers on the Erfurt-Ebensfeld route, 41 kilometers will pass through tunnels and 12 kilometers over bridges. Experts refer to tunnels and bridges as "engineering structures," and they will be more highly concentrated on the new route than in almost any other segment of the German rail system.
Refresh | +1 Recommendations Printer Friendly | Permalink | Reply | Top
dtexdem Donating Member (1000+ posts) Send PM | Profile | Ignore Fri Oct-28-11 10:34 AM
Response to Original message
1. Efficient transit, rather than spewing pollution from jet engines ...
or from auto engines on an autobahn.
Printer Friendly | Permalink | Reply | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Tue Apr 30th 2024, 01:17 AM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Editorials & Other Articles Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC