You are viewing an obsolete version of the DU website which is no longer supported by the Administrators. Visit The New DU.
Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

Reply #2: it's a "deconstruction," not a demolition.... [View All]

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Topic Forums » September 11 Donate to DU
mike_c Donating Member (1000+ posts) Send PM | Profile | Ignore Fri Sep-08-06 09:35 AM
Response to Reply #1
2. it's a "deconstruction," not a demolition....
http://www.lowermanhattan.info/news/animation_details_deutsche_bank_97552.aspx

The video, available for download on the LMDC website, illustrates the process step by step from beginning to end. It documents a preparatory work phase, already underway, that involves the erection of scaffolding and elevator hoists around the exterior, the removal of existing netting around the building, and the installation of new netting. This preparatory phase is scheduled to continue for the next two months.

The next phase depicted in the video, interior abatement, is expected to begin in earnest in early 2006. This phase will include environmental cleaning and removal of all interior surfaces and non-structural elements in the building. It is expected to continue through the end of 2006.

The project's third phase, the actual floor-by-floor deconstruction, will also commence in early 2006. The video helps bring this process to life, showing each step involved, from the breakup of floor slabs to the cutting and lowering of interior beams to the removal of exterior column trees. It also illustrates how a buffer zone and abatement zone will be established beneath each floor as it is deconstructed. During this process, all materials removed from the building will be bagged, rinsed, and bagged a second time. The double-bagged materials will be stored in a sealed-off room until and transported away from the site in sealed trucks using approved routes. Most of the hauling will take place on the west side of Ground Zero. This phase is expected to conclude in spring 2007.

more@link
Printer Friendly | Permalink |  | Top
 

Home » Discuss » Topic Forums » September 11 Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC